Showing posts with label tunnel. Show all posts
Showing posts with label tunnel. Show all posts

Wednesday, January 24, 2024

IBX DOA

 https://www.amny.com/wp-content/uploads/2024/01/01152024_PF_All_Faiths_Cemetery_IBX_151-1200x800.jpg.webpAMNY

The success or failure of Gov. Kathy Hochul’s marquee transit proposal, the Interborough Express (IBX) connecting Brooklyn and Queens by light rail, is centered on a short, skinny tunnel underneath a Queens cemetery that the MTA says requires the line to be routed away from existing railroad tracks and onto the street.

Based on a long-time dream of transit planners and aficionados, the IBX would utilize existing railroad tracks called the Bay Ridge Branch, which were built for the Long Island Rail Road but have long since been used only by freight, and only about one round trip per day at that. The 14-mile spur runs from Bay Ridge, Brooklyn to Jackson Heights, Queens; Hochul first proposed reactivating the line for passenger service back in 2022.

The project is set to bring rail service to several transit-starved neighborhoods and connect to 17 other train lines, while providing a crucial new link for Brooklyn and Queens residents to move between boroughs without having to take a train through Manhattan first. Hochul has described her vision for the IBX as a “transformative” investment in expanding the city’s transit.

After undergoing a “feasibility study,” the MTA opted not to endorse building a subway along the right-of-way. Instead, the MTA endorsed building light rail, which it has never constructed before in New York City despite being in many cities around the world; the agency said this would be $3 billion cheaper (the overall plan is projected to cost $5.5 billion) without sacrificing speed or capacity.

The basis for that claim lies buried among the dead beneath All Faiths Cemetery in Middle Village, Queens, just across the way from the M train’s Metropolitan Avenue terminus. The cemetery opened for business in 1852, and today its 225 acres are the final resting place for 540,000 people, including the grandparents, parents, and older brother of former President Donald Trump.

Also underneath All Faiths is a short tunnel, about 520 feet in length and 30 feet in width, that freight trains under the CSX banner travel under en route to and from Bay Ridge. The MTA says this tunnel is too narrow to add in passenger tracks alongside the freight ones, and expanding it would be prohibitively expensive and require disturbing final resting places above it.

That, in effect, kills the possibility of using subways on the corridor, the MTA claims. Instead, light rail can be routed out of the railroad right-of-way and onto busy Metropolitan Avenue, turning left on 69th Street before returning to the Bay Ridge Branch tracks after two-thirds of a mile.

 This is never going to happen. 

 

Monday, February 24, 2020

City Council's tunnel visions for the BQE


  https://external-content.duckduckgo.com/iu/?u=https%3A%2F%2Fthenypost.files.wordpress.com%2F2018%2F09%2F180920-bqe-wealthy-residents.jpg%3Fquality%3D90%26strip%3Dall%26w%3D618%26h%3D410%26crop%3D1&f=1&nofb=1



NY Daily News/MSN

 New York City officials on Monday pitched an $11 billion tunnel to keep cars off a crumbling stretch of the Brooklyn-Queens Expressway.

A consulting firm hired by the City Council last year floated the tunnel idea as an alternative to the city Department of Transportation’s previous plan to fix the dilapidated road, which would have cost $4 billion to repair and to build a temporary highway above the beloved Brooklyn Heights Promenade during construction.

The tunnel would stretch 3 miles from the Gowanus Expressway where it meets the Prospect 

Expressway to the BQE’s south Williamsburg trench near Bedford Ave. It’s modeled after similar projects in other U.S. cities, such as Boston’s 1.5-mile “Big Dig” tunnel that ended up costing the city $22 billion.

The Council’s consultant also recommended another $3.2 billion idea pitched by architecture firm Bjarke Ingels Group last year to build a park atop a new capped six-lane highway adjacent to the promenade.

Council Speaker Corey Johnson called the rebuilding of the highway a “once-in-a-lifetime opportunity,” but declined to endorse either pitch.

If the city goes with the tunnel option, it would cost more than the estimated $7.2 billion price tag for the first two phases of the Second Ave. subway, which hopes to extend the Q line to East Harlem over the next decade.

The tunnel, which the consultant said would take seven to 10 years to construct, would cost about 35% more. The MTA expects the first two phases of the Second Ave. subway will draw an additional 290,000 daily riders, while the Council’s consultant said the proposed tunnel would be used by some 153,000 vehicles a day.

The BQE tunnel idea was met with skepticism by other Council members, who questioned the city’s ability to build large-scale projects.

“We haven’t been able to build anything on this scale since the ’60s,” said Councilman Joseph Borelli (R-S.I.). “I am less concerned about the price tag than I am over whether a future mayor will have the intestinal fortitude to see it through.”

The DOT is in the middle of an environmental review process for all of the proposals to fix the BQE that is expected to drag on for at least another year.