Thursday, June 29, 2017

Glendale trainyard repairs moved

From the Times Ledger:

Congresswoman Grace Meng (D-Flushing) and other Queens officials announced last week that the New York and Atlantic Railway will reduce noise in Glendale by moving its train repair facility to East New York, providing needed relief to residents in the area.

The freight line will relocate its “Track 11” repair track – which runs alongside Otto Road from 67th Place to 69th Place – to a non-residential area in East New York. The track is located in the railway’s Fresh Pond Rail Yard and is currently used to fix rail cars. Repairs usually consist of hammering, drilling, welding, and includes everything from changing wheels and brake shoes, fixing mechanical problems, and repainting identifying letters and numbers.

NYA plans to complete its repair track move by the end of June. The new location will be in an area that abuts the L train in the NYA’s East New York Tunnel and the existing NYA rail yard.

The train company, which is based in Glendale, operates on Long Island Rail Road tracks and carries lumber, paper, plastics and food, among other types of freight.

Meng said the relocation is good news for Glendale residents, who have been plagued by noise caused by rail car repairs.

2 comments:

Anonymous said...

Since when is jobs moving out of Queens a good thing?

(sarc) said...

Preparations for "shiney new things"...

Post a Comment