2 injured in building collapse
Form
DNA Info:
A home that was under construction partially collapsed in Canarsie Friday afternoon, leaving two people hurt, one seriously, the FDNY said.
The collapse occurred at 867 E. 95th St., near Avenue D, just before 3:15 p.m., the FDNY said.
Of the five people who were working on the building, two suffered serious injuries but were expected to survive, FDNY Deputy Chief Stephen Moro said.
The collapse happened when the floor of the building — a three-story, two family home that was under construction — was overloaded with concrete blocks and other materials and then caved in, the Department of Buildings said.
The DOB issued a full stop work order on the site to continue investigating.
2 comments:
It looks like a Chinese cheese box to me.
Contractor:
Deodath Motilal
Rapid Construction and Renovation
1310 DECKER STREET
VALLEY STEAM NY 11580
This contractor is a registered superintendent of construction - he's responsible for making sure crap like this doesn't happen.
He is currently responsible for supervising MANY MANY MANY MANY jobs. Think that might have something to do with this????
Post a Comment